Service Area: Worldwide
Company Location: United States
For this reason, during the use of construction machinery, it is necessary to prevent overload operation at low concrete placing boom temperatures, ensure normal operation of the low-speed pre-warming phase, and allow the machine to reach the prescribed temperature before proceeding with driving or work.